Stage 1
5 mm. carbon steel
Stage 2
locking stone and foot distance
Stage 3
escapewheel clearance
Stage 4
remove side material
drill hole for locking stone
drill and tap for gold spring and foot
Stage 5
remove from stock and shape horn
reduce spring to 0.010"
Stage 6
wrap in soft iron wire
Stage 7
heat to critical temperature and quench in water/oil combination
Stage 8
clean and temper to dark straw
horn to blue
Stage 9
reduce spring to 0.002"
Stage 10
polish
The images below are of a high count Tavern Clock movement having recoil escapement with small amplitude